Another major project with the bathroom is closer to being finished. I thought all the wall tile was finished until Robert reminded me last night that there is a little strip (what is going to require cutting inch wide tiles all the way down)between the door and the shower. Anyway, we have gotten a lot done: The shower is completed and has been functional for some time. The tub is in and is also functional. The walls are close to done. The next steps are finishing this, tiling the floor, putting in a new sink, putting in a new light fixture, tiling the surround on the tub and putting in the access panel then stripping all the paint off of the door, staining and varnishing it and putting in all new wood trim. I know it sounds like a lot but compared to all the structural stuff Andrew had to do for the tub and shower, I don't think it will take near as long. I am still shooting for us to be done by the end of January. Valentine's Day at the latest!